Removal procedure拆卸程序
|
|
1. Preparation1. 准备工作
1 Park the vehicle on a flat road, activate the parking brake, and put the vehicle's power supply in the "OFF" state.将车辆停在平坦路面,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
|
|
|
2. Remove the driver's side lower left decorative panel assembly2. 拆卸驾驶侧左下装饰板总成
|
|
|
3. Remove the driver’s side lower cover panel assembly3. 拆卸驾驶侧下护板总成
|
|
|
4. Remove the passenger side lower right decorative panel assembly4. 拆卸副驾驶侧右下装饰板总成
|
|
|
5. Remove the left front extension plate assembly5. 拆卸左前延伸板总成
|
|
|
6. Remove the right front extension plate assembly6. 拆卸右前延伸板总成
|
|
|
7. Remove the switch panel assembly7. 拆卸开关面板总成
|
|
|
8. Remove the sub-instrument panel body assembly8. 拆卸副仪表板本体总成
|
|
|
9. Remove the left A-pillar upper trim panel assembly9. 拆卸左A柱上饰板总成
|
|
|
10. Remove the right A-pillar upper trim panel assembly10. 拆卸右A柱上饰板总成
|
|
|
11. Remove driver airbag11. 拆卸驾驶员安全气囊
|
|
|
12. Remove the steering wheel assembly12. 拆卸方向盘总成
|
|
|
13. Remove the steering column lower guard assembly13. 拆卸转向管柱下护罩总成
|
|
|
14. Remove the steering column upper guard assembly14. 拆卸转向管柱上护罩总成
|
|
|
15. Disassemble the combination switch and clock spring assembly15. 拆卸组合开关与时钟弹簧总成
|
|
|
16. Remove the instrument cluster screen16. 拆卸组合仪表屏
|
|
|
17. Remove the touch control screen17. 拆卸触摸控制屏
|
|
|
18. Remove the DVD mounting bracket18. 拆卸DVD安装支架
|
|
|
19. Remove the speaker mask assembly19. 拆卸扬声器面罩总成
|
|
|
20. Remove the mid-range speaker assembly (in the instrument panel)20. 拆卸中音扬声器总成(仪表板中)
|
|
|
21. Remove the left end cover assembly of the instrument panel21. 拆卸仪表板左侧端盖总成
|
|
|
22. Remove the left end cover of the instrument panel22. 拆卸仪表板左侧端盖盖板
|
|
|
23. Remove the air outlet assembly on the left side of the instrument panel23. 拆卸仪表板左侧出风口总成
|
|
|
24. Remove the left center decorative panel assembly on the driver's side24. 拆卸驾驶侧左中装饰板总成
|
|
|
25. Remove the right end cover assembly of the instrument panel25. 拆卸仪表板右侧端盖总成
|
|
|
26. Remove the right end cover of the instrument panel26. 拆卸仪表板右侧端盖盖板
|
|
|
27. Remove the right center decorative panel assembly on the passenger side27. 拆卸副驾驶侧右中装饰板总成
|
|
|
28. Remove the air outlet assembly on the right side of the instrument panel28. 拆卸仪表板右侧出风口总成
|
|
|
29. Remove the center panel assembly29. 拆卸中央面板总成
|
|
|
30. Remove the instrument panel body assembly30. 拆卸仪表板本体总成
|
|
|
31. Disassemble the CCB body connection left bracket assembly31. 拆卸CCB车身连接左支架总成
|
|
|
32. Disassembly of the CCB body-mounted right bracket assembly32. 拆卸CCB车身连接右支架总成
|
|
|
33. Disassemble T-BOX33. 拆卸T-BOX
|
|
|
34. Disassembling the vehicle's smart infotainment head unit34. 拆卸车载智能多媒体主机
|
|
|
35. Disassemble gateway controller35. 拆卸网关控制器
|
|
|
36. Disassemble the PM2.5 sensor36. 拆卸PM2.5传感器
|
|
|
37. Remove the left side cover of the wiper blade.37. 拆卸雨刮盖板左侧盖板
|
|
|
38. Remove the right side cover of the wiper blade.38. 拆卸雨刮盖板右侧盖板
|
|
|
39. Remove the left scraper arm39. 拆卸左刮臂
|
|
|
40. Remove the right scraper arm40. 拆卸右刮臂
|
|
|
41. Remove the wiper cover41. 拆卸雨刮盖板
|
|
|
42. Remove the instrument panel cross member assembly42. 拆卸仪表板横梁总成
|
|
|
1 Remove a total of 4 fixing bolts ① on the left and right sides of the instrument panel cross member.拆卸仪表板横梁左右两侧共4颗固定螺栓①。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
|
2 Disassemble the electric power steering column assembly and connect the 2 fixing nuts ① to the instrument panel cross member.拆卸电动助力转向管柱总成与仪表板横梁连接2颗固定螺母①。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
|
3 Remove the fixing bolt ① to disengage the electric power steering column assembly from its installation position.拆卸固定螺栓①,使电动助力转向管柱总成脱离安装位置。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
|
4 Remove the fixing nut ① connecting the instrument panel cross member assembly and HVAC.拆卸仪表板横梁总成与HVAC连接固定螺母①。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
5 Remove the fixing bolts ① that connect the instrument panel crossbeam assembly and HVAC.拆卸仪表板横梁总成与HVAC连接固定螺栓①。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
6 Remove the 2 fixing bolts ①.拆卸2颗固定螺栓①。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
7 Remove the fixing bolt ① located under the wiper cover.拆卸位于雨刮盖板下方固定螺栓①。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
8 Disconnect all connectors of the instrument panel cross member assembly.断开仪表板横梁总成所有接插件。
9 Remove the instrument panel cross member wiring harness.拆卸仪表板横梁线束。
|
Installation procedure安装程序
|
|
1. Install the instrument panel cross member assembly1. 安装仪表板横梁总成
1 Connect all connectors of the instrument panel cross member assembly.连接仪表板横梁总成所有接插件。
2 Install the dash cross member wiring harness.安装仪表板横梁线束。
|
|
|
3 Place and adjust the instrument panel crossbeam assembly to the installation position, install a total of 4 fixing bolts ① on the left and right sides of the instrument panel crossbeam and tighten them.放置并调整仪表板横梁总成到安装位置,安装仪表板横梁左右两侧共4颗固定螺栓①并紧固。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
Torque requirement: 27-33N·m扭矩要求:27-33N•m |
|
|
|
4 Install the fixing bolt ① located on the underside of the wiper cover and tighten it.安装位于雨刮盖板下侧固定螺栓①并紧固。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
Torque requirement: 27-33N·m扭矩要求:27-33N•m |
|
|
|
5 Install the 2 fixing bolts ① and tighten them.安装2颗固定螺栓①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
|
6 Install the fixing bolts ① connecting the instrument panel cross member and the HVAC assembly and tighten them.安装仪表板横梁与HVAC总成连接固定螺栓①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
|
7 Install the fixing nut ① connecting the instrument panel cross member to the HVAC assembly and tighten it.安装仪表板横梁与HVAC总成连接固定螺母①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
|
8 Install the fixing bolts ① and tighten them.安装固定螺栓①并紧固。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
Torque requirement: 30-36N·m扭矩要求:30-36N•m |
|
|
|
9 Place and adjust the electric power steering column assembly to the dashboard cross member, install 2 fixing nuts ① and tighten them.放置并调整电动助力转向管柱总成到仪表板横梁,安装2颗固定螺母①并紧固。
|
|
Recommended tools: 13mm socket推荐工具:13mm套筒 |
|
|
Torque requirement: 30-36N·m扭矩要求:30-36N•m |
|
|
|
2. Install the wiper cover2. 安装雨刮盖板
|
|
|
3. Install the left side cover of the wiper cover3. 安装雨刮盖板左侧盖板
|
|
|
4. Install the right side cover of the wiper cover4. 安装雨刮盖板右侧盖板
|
|
|
5. Install the left scraper arm5. 安装左刮臂
|
|
|
6. Install the right scraper arm6. 安装右刮臂
|
|
|
7. Install the CCB body connection right bracket assembly7. 安装CCB车身连接右支架总成
|
|
|
8. Install the CCB body connection left bracket assembly8. 安装CCB车身连接左支架总成
|
|
|
9. Install the gateway controller9. 安装网关控制器
|
|
|
10. Install the infotainment head unit10. 安装车载智能多媒体主机
|
|
|
11. Install T-BOX11. 安装T-BOX
|
|
|
12. Install PM2.5 sensor12. 安装PM2.5传感器
|
|
|
13. Install the instrument panel body assembly13. 安装仪表板本体总成
|
|
|
14. Install the center panel assembly14. 安装中央面板总成
|
|
|
15. Install the air outlet assembly on the right side of the instrument panel15. 安装仪表板右侧出风口总成
|
|
|
16. Install the right center decorative panel assembly on the passenger side16. 安装副驾驶侧右中装饰板总成
|
|
|
17. Install the right end cover of the instrument panel17. 安装仪表板右侧端盖盖板
|
|
|
18. Install the right end cover assembly of the instrument panel18. 安装仪表板右侧端盖总成
|
|
|
19. Install the left center decorative panel assembly on the driver's side19. 安装驾驶侧左中装饰板总成
|
|
|
20. Install the air outlet assembly on the left side of the instrument panel20. 安装仪表板左侧出风口总成
|
|
|
21. Install the left end cover of the instrument panel21. 安装仪表板左侧端盖盖板
|
|
|
22. Install the left end cover assembly of the instrument panel22. 安装仪表板左侧端盖总成
|
|
|
23. Install the midrange speaker assembly (in the instrument panel)23. 安装中音扬声器总成(仪表板中)
|
|
|
24. Install the speaker mask assembly24. 安装扬声器面罩总成
|
|
|
25. Install the DVD mounting bracket25. 安装DVD安装支架
|
|
|
26. Install the touch control screen26. 安装触摸控制屏
|
|
|
27. Install the instrument cluster screen27. 安装组合仪表屏
|
|
|
28. Install the combination switch and clock spring assembly28. 安装组合开关与时钟弹簧总成
|
|
|
29. Install the steering column upper guard assembly29. 安装转向管柱上护罩总成
|
|
|
30. Install the steering column lower guard assembly30. 安装转向管柱下护罩总成
|
|
|
31. Install the steering wheel assembly31. 安装方向盘总成
|
|
|
32. Install driver's safety airbag32. 安装驾驶员安全气囊
|
|
|
33. Install the right A-pillar upper trim panel assembly.33. 安装右A柱上饰板总成
|
|
|
34. Install the left A-pillar upper trim panel assembly.34. 安装左A柱上饰板总成
|
|
|
35. Install the secondary instrument panel body assembly.35. 安装副仪表板本体总成
|
|
|
36. Install switch panel assembly36. 安装开关面板总成
|
|
|
37. Install right front extension panel assembly37. 安装右前延伸板总成
|
|
|
38. Install left front extension panel assembly38. 安装左前延伸板总成
|
|
|
39. Install the lower right trim panel assembly on the passenger side.39. 安装副驾驶侧右下装饰板总成
|
|
|
40. Install the driver's side lower cover panel assembly40. 安装驾驶侧下护板总成
|
|
|
41. Install the driver's side lower left decorative panel assembly41. 安装驾驶侧左下装饰板总成
|
|
|
42. Connect the negative terminal of the 12V battery42. 连接蓄电池负极
|