Electrical › Heating air conditioning ventilation system › Repair
空调高压管总成Ⅰ · T00617340

 Air conditioning high pressure pipe assembly Ⅰ空调高压管总成Ⅰ

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Recycle refrigerant2. 回收制冷剂
3. Remove the front compartment front upper cover panel assembly3. 拆卸机舱前上护板总成
4. Remove the left front wheel arch assembly4. 拆卸左前轮眉总成
5. Remove the right front wheel arch assembly5. 拆卸右前轮眉总成
6. Remove the front bumper assembly6. 拆卸前保险杠总成
  Note:提示:
♦  Just remove the front bumper assembly and accessories as a whole without disassembling them.将前保险杠总成及附件整体拆下即可,不必进行拆分。
7. Remove the front-end module central support bracket assembly7. 拆卸前端模块中央支撑支架总成
8. Remove the filling port8. 拆卸加注口
9. Disassemble the washing kettle assembly9. 拆卸洗涤水壶总成
10. Disassemble the woofer assembly (low speed beep)10. 拆卸低音扬声器总成(低速提示音)
11. Remove the front anti-collision beam assembly11. 拆卸前防撞梁总成
12. Remove the center lower air deflector12. 拆卸中央下部导流板
13. Remove the active air intake grille13. 拆卸下主动进气格栅
14. Disassemble the air conditioning high-pressure pipe assembly Ⅰ14. 拆卸空调高压管总成Ⅰ
Graphic
1 Disconnect connector A, remove the fixing bolt ①, and disconnect the air-conditioning high-pressure pipe assembly Ⅰ from the condenser.断开接插件A,拆卸固定螺栓①,断开空调高压管总成Ⅰ与冷凝器的连接。
Recommended tools: 10mm socket推荐工具:10mm套筒
Graphic
2 Remove the fixing bolts ①, disconnect the air-conditioning high-pressure pipe assembly I from the thermal management integrated module, and take out the air-conditioning high-pressure pipe assembly IA.拆卸固定螺栓①,断开空调高压管总成Ⅰ与热管理集成模块的连接,取出空调高压管总成ⅠA。
Recommended tools: 10mm socket推荐工具:10mm套筒
Installation procedure安装程序
1. Install air conditioning high-pressure pipe assembly Ⅰ1. 安装空调高压管总成Ⅰ
Graphic
1 Place and adjust the air-conditioning high-pressure pipe assembly IA to the installation position, and connect the air-conditioning high-pressure pipe assembly IA to the thermal management integrated module.放置并调整空调高压管总成ⅠA到安装位置,连接空调高压管总成ⅠA到热管理集成模块。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 6-10N·m扭矩要求:6-10N•m
  Caution:注意:
♦  The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。
Graphic
2 Connect the air conditioning high-pressure pipe assembly I to the condenser, connect the connector A, install the fixing bolt ① and tighten it.连接空调高压管总成Ⅰ到冷凝器,连接接插件A,安装固定螺栓①并紧固。
Recommended tools: 10mm socket推荐工具:10mm套筒
2. Install the lower active air intake grille2. 安装下主动进气格栅
3. Install the center lower deflector3. 安装中央下部导流板
4. Install the front anti-collision beam4. 安装前防撞梁
5. Install the woofer assembly (low speed beep)5. 安装低音扬声器总成(低速提示音)
6. Install the washing kettle assembly6. 安装洗涤水壶总成
7. Install the filling port7. 安装加注口
8. Install the front-end module central support bracket assembly8. 安装前端模块中央支撑支架总成
9. Install the front bumper assembly9. 安装前保险杠总成
10. Install the right front wheel arch assembly10. 安装右前轮眉总成
11. Install the left front wheel arch assembly11. 安装左前轮眉总成
12. Install the front compartment front upper cover panel assembly12. 安装机舱前上护板总成
13. Add refrigerant13. 加注制冷剂
14. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle and drive away from the lift14. 降落车辆,连接蓄电池负极,起动车辆并驶离举升机