EV systems › Cooling system › Repair
ITS至IDU水管I · T00610625

 ITS to IDU water pipe ⅠITS至IDU水管Ⅰ

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Connect the negative terminal of the 12V battery.连接蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Remove the front compartment front lower cover panel assembly2. 拆卸机舱前下护板总成
3. Drain the coolant from the temperature control system3. 排放温控系统冷却液
4. Remove the front compartment front upper cover panel assembly4. 拆卸机舱前上护板总成
5. Remove the left front wheel arch assembly5. 拆卸左前轮眉总成
6. Remove the right front wheel arch assembly6. 拆卸右前轮眉总成
7. Remove the front bumper assembly7. 拆卸前保险杠总成
8. Disassemble the ITS to IDU water pipe Ⅰ8. 拆卸ITS至IDU水管Ⅰ
Graphic
1 Disconnect connector A of water pipe I from ITS to IDU and water pipe I from ITS to charger.断开ITS至IDU水管Ⅰ接头A与ITS至充电机水管Ⅰ的连接。
Graphic
2 Disconnect joint A of water pipe I from ITS to IDU and the thermal management integrated module, and remove water pipe I from ITS to IDU.断开ITS至IDU水管Ⅰ接头A与热管理集成模块连接,取下ITS至IDU水管Ⅰ。
Installation procedure安装程序
1. Install ITS to IDU water pipe Ⅰ1. 安装ITS至IDU水管Ⅰ
Graphic
1 Place and adjust the ITS to the IDU water pipe I to the installation position, and connect the water pipe joint A to the thermal management integrated module.放置并调整ITS至IDU水管Ⅰ到安装位置,连接水管接头A到热管理集成模块。
Graphic
2 Connect ITS to IDU water pipe I connector A to ITS to charger water pipe I.连接ITS至IDU水管I接头A到ITS至充电机水管Ⅰ。
2. Fill the temperature control system coolant2. 加注温控系统冷却液
3. Install the front compartment front lower cover panel assembly3. 安装机舱前下护板总成
4. Install front bumper assembly4. 安装前保险杠总成
5. Install the left front wheel arch trim assembly5. 安装左前轮眉总成
6. Install the right front wheel arch trim assembly6. 安装右前轮眉总成
7. Install the front compartment front upper cover panel assembly7. 安装机舱前上护板总成
8. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle and drive away from the lift, check that the cooling system should be working normally8. 降落车辆,连接蓄电池负极,起动车辆并驶离举升机,检查冷却系统应正常工作