EV systems › Charging system › Repair
充电插座线束(换电) · T00617086

 Charging socket wiring harness (battery-swap)充电插座线束(换电)

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Remove the charging port assembly2. 拆卸充电口总成
3. Remove the right front wheel assembly3. 拆卸右前车轮总成
4. Remove the right front wheel arch assembly4. 拆卸右前轮眉总成
5. Remove the right front wheel fender assembly5. 拆卸右前轮挡泥板总成
6. Remove the front compartment front lower cover panel assembly6. 拆卸机舱前下护板总成
7. Remove the charging socket wiring harness7. 拆卸充电插座线束
Graphic
1 Remove 4 fixing nuts ① and 2 fixing bolts ②, and disengage the wire harness clip.拆卸4颗固定螺母①、2颗固定螺栓②,脱开线束卡扣。
Recommended tools: 10mm socket, snap driver推荐工具:10mm套筒、 卡扣起子
Graphic
2 Remove the 4 fixing bolts ①.拆卸4颗固定螺栓①。
Recommended tools: 10mm socket推荐工具:10mm套筒
Graphic
3 Disconnect connector A and release the emergency cable fixing clip.断开接插件A,脱开应急拉索固定卡扣。
Recommended tools: clip remover推荐工具:卡扣起子
Graphic
4 Disconnect connector A.断开接插件A。
Graphic
5 Disconnect connector A.断开接插件A。
6 Disengage all remaining fixing clips and remove the charging socket harness.脱开剩余所有固定卡扣,取下充电插座线束。
Installation procedure安装程序
1. Install the charging socket wiring harness1. 安装充电插座线束
Graphic
1 Place and adjust the charging socket harness to the installation position, and connect connector A.放置并调整充电插座线束到安装位置,连接接插件A。
Graphic
2 Connect connector A.连接接插件A。
Graphic
3 Install the emergency cable fixing clip and connect connector A.安装应急拉索固定卡扣,连接接插件A。
Graphic
4 Install the 4 fixing bolts ① and tighten them.安装4颗固定螺栓①并紧固。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 6-10N·m扭矩要求:6-10N•m
Graphic
5 Install 4 fixing nuts ① and 2 fixing bolts ② and tighten them, and install the wire harness fixing clip.安装4颗固定螺母①、2颗固定螺栓②并紧固,安装线束固定卡扣。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirements: 6-10N·m①, 8-12N·m②扭矩要求:6-10N•m①、8-12N•m②
6 Install all remaining wire harness clips.安装剩余所有线束卡扣。
2. Install the charging port assembly2. 安装充电口总成
3. Install the right front wheel fender assembly3. 安装右前轮挡泥板总成
4. Install the right front wheel4. 安装右前车轮
5. Install the right front wheel arch trim assembly5. 安装右前轮眉总成
6. Install the front lower guard panel of the front compartment6. 安装机舱前下护板
7. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle, and check that the charging socket wiring harness should be working normally.7. 降落车辆,连接蓄电池负极,启动车辆,检查充电插座线束应正常工作