Electrical › Heating air conditioning ventilation system › Repair
空调压缩机总成 · T00609886

 Air conditioning compressor assembly空调压缩机总成

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Recycle refrigerant2. 回收制冷剂
3. Remove the left front wheel arch assembly3. 拆卸左前轮眉总成
4. Remove the left front wheel assembly4. 拆卸左前车轮总成
5. Remove the left front wheel fender assembly5. 拆卸左前轮挡泥板总成
6. Disassemble the air conditioning compressor assembly6. 拆卸空调压缩机总成
Graphic
1 Remove the fixing bolts ①, ②, and ③, and disconnect the air-conditioning pipelines A and B from the air-conditioning compressor assembly.拆卸固定螺栓①、②、③,断开空调管路A、B与空调压缩机总成的连接。
Recommended tools: 10mm socket推荐工具:10mm套筒
  Caution:注意:
♦  After disconnecting the air conditioning pipeline, seal or block the pipeline interface in time to prevent foreign matter from entering.断开空调管路后应及时密封或堵塞管路接口,避免异物进入。
Graphic
2 Disconnect connectors A and B, remove 4 fixing bolts ①, and remove the air conditioning compressor assembly.断开接插件A、B,拆卸4颗固定螺栓①,取下空调压缩机总成。
Recommended tools: 10mm socket推荐工具:10mm套筒
  Warning:警告:
♦  Be careful when removing the air conditioner compressor assembly to avoid component damage or even personal injury caused by falling or bumping.取下空调压缩机总成时应谨慎操作,避免因掉落或磕碰造成部件损坏甚至人员受伤。
Installation procedure安装程序
1. Install air conditioning compressor assembly1. 安装空调压缩机总成
Graphic
1 Place and adjust the air conditioning compressor assembly to the installation position, install and tighten 4 fixing bolts ①, and connect connectors A and B.放置并调整空调压缩机总成到安装位置,安装4颗固定螺栓①并紧固,连接接插件A、B。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 22-28N·m扭矩要求:22-28N•m
  Warning:警告:
♦  Care should be taken when installing the air conditioner compressor assembly to avoid component damage or even personal injury caused by falling or bumping.安装空调压缩机总成时应谨慎操作,避免因掉落或磕碰造成部件损坏甚至人员受伤。
Graphic
2 Connect the air conditioning pipelines A and B to the air conditioning compressor assembly, install and tighten the fixing bolts ③, ②, ①.连接空调管路A、B到空调压缩机总成,安装固定螺栓③、②、①并紧固。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 6-10N·m扭矩要求:6-10N•m
  Caution:注意:
♦  The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。
2. Install the left front wheel fender assembly2. 安装左前轮挡泥板总成
3. Install the left front wheel arch trim assembly3. 安装左前轮眉总成
4. Install the left front wheel assembly4. 安装左前车轮总成
5. Add refrigerant5. 加注制冷剂
6. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle, and check that the air conditioning and refrigeration system should be working normally.6. 降落车辆,连接蓄电池负极,启动车辆,检查空调制冷系统应正常工作