EV systems › High voltage power distribution system › Repair
电池高压线束Ⅰ(换电) · T00617253

 Battery high-voltage wiring harness I (battery-swap version)电池高压线束Ⅰ(换电版)

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Remove the front compartment front lower cover panel assembly2. 拆卸机舱前下护板总成
3. Disassemble the battery pack assembly (battery-swap version)3. 拆卸电池组箱总成(换电版)
4. Remove the battery high-voltage wiring harness Ⅰ4. 拆卸电池高压线束Ⅰ
Graphic
1 Disconnect connector A.断开接插件A。
Graphic
2 Remove the grounding bolt ① and disconnect connectors A and B.拆卸接地螺栓①,断开接插件A、B。
Recommended tools: 10mm socket推荐工具:10mm套筒
Graphic
3 Remove the 4 fixing bolts ①.拆卸4颗固定螺栓①。
Recommended tools: 10mm socket推荐工具:10mm套筒
4 Pry open the wiring harness fixing card and remove the battery high-voltage wiring harness I.撬开线束固定卡,取下电池高压线束Ⅰ。
Recommended tools: clip remover推荐工具:卡扣起子
Installation procedure安装程序
1. Install battery high-voltage wiring harness Ⅰ1. 安装电池高压线束Ⅰ
1 Place and adjust the battery high-voltage wire harness I to the installation position, and install the wire harness fixing card.放置并调整电池高压线束Ⅰ到安装位置,安装线束固定卡。
Graphic
2 Install the high-voltage wiring harness bracket to the body, install 4 fixing bolts ① and tighten them.安装高压线束支架到车身,安装4颗固定螺栓①并紧固。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 6-10N·m扭矩要求:6-10N•m
Graphic
3 Connect connectors A and B, install grounding bolt ① and tighten.连接接插件A、B,安装接地螺栓①并紧固。
Recommended tools: 10mm socket推荐工具:10mm套筒
Torque requirement: 8-12N·m扭矩要求:8-12N•m
Graphic
4 Connect connector A.连接接插件A。
2. Install the battery pack assembly (battery-swap version)2. 安装电池组箱总成(换电版)
3. Install the front compartment front lower cover panel assembly3. 安装机舱前下护板总成
4. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle and drive away from the lift4. 降落车辆,连接蓄电池负极,起动车辆并驶离举升机