Removal procedure拆卸程序
|
|
1. Preparation1. 准备工作
1 Park the vehicle on a flat road, activate the parking brake, and put the vehicle's power supply in the "OFF" state.将车辆停在平坦路面,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
|
|
|
2. Recycle refrigerant2. 回收制冷剂
|
|
|
3. Remove the high voltage distribution box3. 拆卸高压配电盒
|
|
|
4. Remove the high-voltage wiring harness bracket I4. 拆卸高压线束支架I
|
|
|
5. Disassemble the air conditioning exhaust pipe assembly II5. 拆卸空调排气管总成Ⅱ
|
|
|
1 Remove the 2 fixing nuts ① and disconnect the air conditioner exhaust pipe assembly Ⅱ from the pipeline.拆卸2颗固定螺母①,断开空调排气管总成Ⅱ与管路的连接。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
2 Remove the 2 fixing bolts ②.拆卸2颗固定螺栓②。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
3 Disconnect connector A, remove the fixing bolt ③, and disconnect the air conditioning exhaust pipe assembly Ⅱ from the HVAC assembly.断开接插件A,拆卸固定螺栓③,断开空调排气管总成Ⅱ与HVAC总成的连接。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
4 Remove the 2 fixing bolts ①.拆卸2颗固定螺栓①。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
5 Remove the 2 fixing bolts ① and take out the air conditioner exhaust pipe assembly Ⅱ.拆卸2颗固定螺栓①,取出空调排气管总成Ⅱ。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
Installation procedure安装程序
|
|
1. Install air conditioning exhaust pipe assembly II1. 安装空调排气管总成Ⅱ
|
|
|
1 Place and adjust the air conditioner exhaust pipe assembly Ⅱ to the installation position, install 2 fixing bolts ① and tighten them.放置并调整空调排气管总成Ⅱ到安装位置,安装2颗固定螺栓①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
Caution:注意: |
|
♦
|
The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。 |
|
|
|
|
|
2 Place the bracket in a suitable position, install 2 fixing bolts ① and tighten.放置支架到合适位置,安装2颗固定螺栓①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
|
3 Connect the air conditioning exhaust pipe assembly Ⅱ to the HVAC assembly, install the fixing bolt ③ and tighten it.连接空调排气管总成Ⅱ到HVAC总成,安装固定螺栓③并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
Caution:注意: |
|
♦
|
The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。 |
|
|
4 Place the bracket into a suitable position, install 2 fixing bolts ② and tighten them.放置支架到合适位置,安装2颗固定螺栓②并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
5 Connect the air conditioning pipe joint, install 2 fixing nuts ① and tighten them.连接空调管路接头,安装2颗固定螺母①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
Caution:注意: |
|
♦
|
The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。 |
|
|
|
|
|
2. Install the high-voltage wiring harness bracket I2. 安装高压线束支架I
|
|
|
3. Install high-voltage distribution box3. 安装高压配电盒
|
|
|
4. Add refrigerant4. 加注制冷剂
|
|
|
5. Connect the negative terminal of the 12V battery, start the vehicle, and check that the air conditioning system should work normally.5. 连接蓄电池负极,启动车辆,检查空调系统应正常工作
|