EV systems › Cooling system › Repair
ITS至IDU水管II · T00610626

 ITS to IDU water pipe ⅡITS至IDU水管Ⅱ

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
2. Remove the front compartment front lower cover panel assembly2. 拆卸机舱前下护板总成
3. Drain the coolant from the temperature control system3. 排放温控系统冷却液
4. Remove ITS to IDU water pipe II4. 拆卸ITS至IDU水管Ⅱ
Graphic
1 Disconnect connector A from ITS to IDU water pipe II and from ITS to charger water pipe I.断开ITS至IDU水管Ⅱ接头A与ITS至充电机水管Ⅰ的连接。
Graphic
2 Disconnect joint A of the ITS to IDU water pipe II from the integrated electric drive assembly, disengage the fixing card, and remove the ITS to IDU water pipe II. .断开ITS至IDU水管Ⅱ接头A与集成电力驱动总成的连接,脱开固定卡,取下ITS至IDU水管Ⅱ。。
Installation procedure安装程序
1. Install ITS to IDU water pipe II1. 安装ITS至IDU水管Ⅱ
Graphic
1 Place and adjust the ITS to the IDU water pipe II to the installation position, and connect the water pipe joint A to the integrated electric drive assembly.放置并调整ITS至IDU水管Ⅱ到安装位置,连接水管接头A到集成电力驱动总成。
Graphic
2 Connect ITS to IDU water pipe II connector A to ITS to charger water pipe I, and install the fixing card.连接ITS至IDU水管Ⅱ接头A到ITS至充电机水管Ⅰ,安装固定卡。
2. Fill the temperature control system coolant2. 加注温控系统冷却液
3. Install the front compartment front lower cover panel assembly3. 安装机舱前下护板总成
4. Land the vehicle, connect the negative terminal of the 12V battery, start the vehicle and drive away from the lift, check that the cooling system should be working normally4. 降落车辆,连接蓄电池负极,起动车辆并驶离举升机,检查冷却系统应正常工作