EV systems › Cooling system › Repair
ITS至PTC水管 · T00609777

 ITS to PTC water pipeITS至PTC水管

Removal procedure拆卸程序
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Lift the vehicle.举升车辆。
2. Remove the front compartment front lower cover panel assembly2. 拆卸机舱前下护板总成
3. Drain the coolant from the temperature control system3. 排放温控系统冷却液
4. Disassemble the ITS to PTC water pipe4. 拆卸ITS至PTC水管
Graphic
1 Disconnect water pipe connector A.断开水管接头A。
Graphic
2 Disconnect water pipe joint A, disengage the pipe fixing clip, and take out the ITS to PTC water pipe.断开水管接头A,脱开管路固定卡,取出ITS至PTC水管。
Installation procedure安装程序
1. Install ITS to PTC water pipe1. 安装ITS至PTC水管
Graphic
1 Place and adjust the ITS to PTC water pipe to the installation position, and install water pipe joint A.放置并调整ITS至PTC水管到安装位置,安装水管接头A。
Graphic
2 Connect the water pipe joint A and install the pipe fixing card.连接水管接头A,安装管路固定卡。
2. Fill the temperature control system coolant2. 加注温控系统冷却液
3. Install the front compartment front lower cover panel assembly3. 安装机舱前下护板总成
4. Land the vehicle, start the vehicle and drive away from the lift, check that the cooling system should be working normally4. 降落车辆,起动车辆并驶离举升机,检查冷却系统应正常工作