PTC to ITS water pipePTC至ITS水管
Removal procedure拆卸程序
|
1. Preparation1. 准备工作
1 Drive the vehicle into the lift position, activate the parking brake, and put the vehicle power supply in the "OFF" state.将车辆驶入举升机举升位置,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
3 Lift the vehicle.举升车辆。
|
|
2. Remove the front compartment front lower cover panel assembly2. 拆卸机舱前下护板总成
|
|
3. Drain the coolant from the temperature control system3. 排放温控系统冷却液
|
|
4. Disassemble the PTC to ITS water pipe4. 拆卸PTC至ITS水管
|
![]() |
1 Disconnect water pipe connector A.断开水管接头A。
|
![]() |
2 Disconnect water pipe joint A, disengage the pipe fixing clip, and take out the PTC to ITS water pipe.断开水管接头A,脱开管路固定卡,取出PTC至ITS水管。
|
Installation procedure安装程序
|
1. Install PTC to ITS water pipe1. 安装PTC至ITS水管
|
![]() |
1 Place and adjust the PTC to ITS water pipe to the installation position, install the pipe fixing card, and install water pipe joint A.放置并调整PTC至ITS水管到安装位置,安装管路固定卡,安装水管接头A。
|
![]() |
2 Connect the water pipe connector A.连接水管接头A。
|
|
2. Fill the temperature control system coolant2. 加注温控系统冷却液
|
|
3. Install the front compartment front lower cover panel assembly3. 安装机舱前下护板总成
|
|
4. Land the vehicle, start the vehicle and drive away from the lift, check that the cooling system should be working normally4. 降落车辆,起动车辆并驶离举升机,检查冷却系统应正常工作
|

