Removal procedure拆卸程序
|
|
1. Preparation1. 准备工作
1 Park the vehicle on a flat road, activate the parking brake, and put the vehicle's power supply in the "OFF" state.将车辆停在平坦路面,启用驻车制动,使整车电源处于“OFF”状态。
2 Disconnect the negative terminal of the 12V battery.断开蓄电池负极。
|
|
|
2. Recycle refrigerant2. 回收制冷剂
|
|
|
3. Disassemble the air conditioning exhaust pipe assembly Ⅰ3. 拆卸空调排气管总成Ⅰ
|
|
|
1 Remove the fixing nut ① and disconnect the pipeline.拆卸固定螺母①,断开管路连接。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
|
2 Disconnect connector A and remove the fixing bolt ①.断开接插件A,拆卸固定螺栓①。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
3 Remove the fixing bolt ②, disconnect the air-conditioning exhaust pipe assembly I from the air-conditioning compressor, and take out the air-conditioning exhaust pipe assembly I.拆卸固定螺栓②,断开空调排气管总成Ⅰ与空调压缩机的连接,取出空调排气管总成Ⅰ。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
Installation procedure安装程序
|
|
1. Install air conditioning exhaust pipe assembly Ⅰ1. 安装空调排气管总成Ⅰ
|
|
|
1 Place and adjust the air-conditioning exhaust pipe assembly I to the installation position, connect the air-conditioning exhaust pipe assembly I to the air-conditioning compressor, and install and tighten the fixing bolts ②.放置并调整空调排气管总成Ⅰ到安装位置,连接空调排气管总成Ⅰ到空调压缩机,安装固定螺栓②紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
Caution:注意: |
|
♦
|
The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。 |
|
|
2 Install the fixing bolt ① and tighten it, and connect connector A.安装固定螺栓①并紧固,连接接插件A。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
|
3 Connect the air conditioning pipe joint, install the fixing nut ① and tighten it.连接空调管路接头,安装固定螺母①并紧固。
|
|
Recommended tools: 10mm socket推荐工具:10mm套筒 |
|
|
Torque requirement: 6-10N·m扭矩要求:6-10N•m |
|
|
Caution:注意: |
|
♦
|
The O-ring of the air conditioning pipeline is a disposable part, please use new parts for each installation.空调管路O型圈为一次性部件,每次安装请使用新件。 |
|
|
|
|
|
2. Add refrigerant2. 加注制冷剂
|
|
|
3. Connect the negative terminal of the 12V battery, start the vehicle, and check that the air conditioning system should work normally.3. 连接蓄电池负极,启动车辆,检查空调系统应正常工作
|