|
①Power on check上电检查
|
|
1. |
Repower the vehicle, use the diagnostic tool to read and clear the fault codes, and check whether the fault codes and symptoms are eliminated.车辆重新上电,使用诊断仪读取并清除故障码,检查故障码及症状是否排除。
|
Are the test results normal?检查结果是否正常?
|
Yes是 |
Fault resolved.故障排除。 |
|
|
②Check 12V battery voltage检查蓄电池电压
|
|
1. |
Power state is "OFF", disconnect the negative terminal of the 12V battery.电源状态“OFF”,断开蓄电池负极。
|
|
2. |
Use a digital multimeter to measure the voltage between the positive and negative terminals of the 12V battery.用数字万用表测量蓄电池正负极之间的电压。
Standard voltage value: about 12.5V标准电压值:约12.5V
|
Are the test results normal?检查结果是否正常?
|
|
③Check DCDC output voltage检查DCDC输出电压
|
|
1. |
The vehicle is powered on.车辆上电。
|
|
2. |
Use a digital multimeter to measure the voltage between the positive and negative terminals of the 12V battery.用数字万用表测量蓄电池正负极之间的电压。
Standard voltage value: about 14V标准电压值:约14V
|
Are the test results normal?检查结果是否正常?
|
Yes是 |
Charge the 12V battery and replace it if necessary.对蓄电池进行充电,必要时更换蓄电池。 |
|
No否 |
Inspect DCDC and its lines.检修DCDC及其线路。 |
|
|
④Check the combination switch and clock spring assembly and power circuit检查组合开关与时钟弹簧总成常电源线路
|
 |
|
1. |
Power state is "OFF", disconnect the negative terminal of the 12V battery.电源状态“OFF”,断开蓄电池负极。
|
|
2. |
Disconnect the combination switch and clock spring assembly harness connector IP31/IP33.断开组合开关与时钟弹簧总成线束接插件IP31/IP33。
|
|
3. |
Connect the negative terminal of the 12V battery.连接蓄电池负极。
|
|
4. |
Use a digital multimeter to measure the voltage between pin 1 of the IP31 and ground.用数字万用表测量IP31的1号针脚与接地之间的电压。
Standard voltage value: about 12.5V标准电压值:约12.5V
|
|
 |
e. Use a digital multimeter to measure the voltage between pin 1 of IP33 and ground.e.用数字万用表测量IP33的1号针脚与接地之间的电压。
Standard voltage value: about 12.5V标准电压值:约12.5V
Are the test results normal?检查结果是否正常?
|
No否 |
Repair or replace the combination switch and clock spring assembly and power wiring harness.维修或更换组合开关与时钟弹簧总成常电源线束。 |
|
|
⑤Check the combined switch and clock spring assembly IG power circuit检查组合开关与时钟弹簧总成IG电源线路
|
 |
|
1. |
Power state is "OFF", disconnect the negative terminal of the 12V battery.电源状态“OFF”,断开蓄电池负极。
|
|
2. |
Disconnect the combination switch and clock spring assembly harness connector IP31.断开组合开关与时钟弹簧总成线束接插件IP31。
|
|
3. |
Connect the negative terminal of the 12V battery and the power status is "ON".连接蓄电池负极,电源状态“ON”。
|
|
4. |
Use a digital multimeter to measure the voltage between pin 6 of the IP31 and ground.用数字万用表测量IP31的6号针脚与接地之间的电压。
Standard voltage value: about 14V标准电压值:约14V
|
Are the test results normal?检查结果是否正常?
|
No否 |
Repair or replace the combined switch and clock spring assembly IG power harness.维修或更换组合开关与时钟弹簧总成IG电源线束。 |
|
|
⑥Replace the combination switch and clock spring assembly更换组合开关与时钟弹簧总成
|
|
1. |
Replace the combined switch and clock spring assembly with a new one, and check whether the fault code and symptoms are eliminated.更换新的组合开关与时钟弹簧总成,检查故障码及症状是否排除。
|
Are the test results normal?检查结果是否正常?
|
Yes是 |
Fault resolved.故障排除。 |
|
No否 |
Look for causes from other symptoms.从其他症状查找原因。 |
Caution:注意: |
|
♦
|
After replacing the combination switch and clock spring assembly, you need to use a diagnostic instrument to recalibrate the combination switch and clock spring assembly.更换组合开关与时钟弹簧总成后,需用诊断仪对组合开关与时钟弹簧总成重新标定。 |
|
|