Warning:警告: |
|
♦
|
Before inspecting or servicing a high-voltage distribution system, be sure to follow all safety precautions, such as wearing insulating gloves to protect against electric shock在检查或维修高压配电系统之前,务必遵守所有安全措施,例如戴好绝缘手套以防止电击 |
|
♦
|
Before performing maintenance on the high-voltage power distribution system, the vehicle power supply must be turned off and the negative terminal of the 12V battery must be disconnected, and the operation must be waited for 3 minutes.对高压配电系统维护前,必须关闭整车电源和断开蓄电池负极,且需等待3min后方可进行操作。 |
|
♦
|
It is forbidden to directly touch any high-voltage components of the vehicle with your hands. Special insulated tools must be used when maintaining the high-voltage distribution system.禁止用手直接接触车辆的任何高压部件,对高压配电系统进行维护时必须使用专用的绝缘工具。 |
|
♦
|
If the high-voltage wire harness is damaged, new parts must be replaced. Repairs to the high-voltage wire harness are prohibited.高压线束如有破损需更换新部件,禁止对高压线束进行维修。 |
|
♦
|
After performing maintenance work on the high-voltage power distribution system, complete inspections are required to ensure that each wire harness and components are firmly connected and not damaged.对高压配电系统进行维护作业后,需要进行完善的检查,确保各个线束及部件连接牢固且无破损现象。 |
|
♦
|
Violation of the above safety instructions may result in personal injury and/or vehicle damage, etc.违反上述安全须知,可能导致人身伤害和/或车辆损坏等 |
|